Solar permit plan sets for Arapahoe County, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Arapahoe County at a glance
| County | Arapahoe County |
|---|---|
| Utility | Xcel Energy (western unincorporated areas); IREA (much of the central and eastern county) |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Arapahoe County Public Works and Development, Building Division, through the Customer Access (Accela) portal only; PDF files only, county naming conventions; four separate document sets (engineer's submission, plan set, specification set, signed checklist). ESS, EV chargers, main breaker derates and service upgrades each need a separate permit. Incomplete sets rejected at intake. No sheet size or review time stated.
Who signs the plans
Arapahoe County Building Division issues a combination building and electrical permit for unincorporated areas. A Colorado-licensed structural engineer's stamped evaluation letter, stamped aerial view and stamped attachment detail are required on every job; no electrical engineer seal required.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Arapahoe County's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.