Solar permit plan sets for Arvada, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Arvada at a glance
| County | Jefferson County / Adams County |
|---|---|
| Utility | Xcel Energy |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Arvada Building Division, online through the Arvada Permits site (eTRAKiT, arvadapermits.org); all attachments PDF. Per the city's 2026 Process Improvements page (search extract), from 2026-06-01 residential solar permits no longer get a formal building plan review before issue; applicants stay responsible for code and manufacturer compliance. Permits without plan review typically issue within 1 business day (third-party guide). Fee: $55 residential flat-rate PV permit on the fee schedule (older FAQ shows $45 + $32.50 review). Sample approved sets on the portal are 11 x 17 (ANSI B);
Who signs the plans
City of Arvada Building Division issues and inspects building and electrical (not DORA). The city's solar page asks for an engineer's report on the roof's capacity for every roof mount; with plan review dropped from 2026-06-01 it is unclear whether the report is still uploaded at application or checked at inspection.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Arvada's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.