Solar permit plan sets for Aurora, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Aurora at a glance
| County | Arapahoe County |
|---|---|
| Utility | Xcel Energy (most of the city); IREA in parts of southeast Aurora |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Aurora Public Works, Building Division, through aurora4biz.org (electronic) or in person; one building permit covers structural and electrical review. Form #A205 requires point-to-point fault current calculations for new and existing panelboards. No sheet size or review time stated.
Who signs the plans
City of Aurora Building Division issues the building and electrical permits (city electrical inspections: electrical rough, frame final, electrical final). Structural: an engineer's letter and stamped layout/anchorage plan on every residential job. Electrical drawings need no engineer's seal per Form #A205.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Aurora's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.