Solar permit plan sets for Boulder, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Boulder at a glance
| County | Boulder County |
|---|---|
| Utility | Xcel Energy |
| Permit path | Full plan review |
| Structural engineer's stamp | We confirm this with the department before you pay |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Boulder Planning & Development Services, electrical permit through the Customer Self-Service portal (energovcss.bouldercolorado.gov). Each checklist item uploaded as its own PDF named Prefix_Address_Date (e.g. ElecPln_..., StrucLtr_...), max 100 MB per file; drawings legible and to a standard scale; leave a 3 in x 3 in blank area in the lower-right of the cover sheet for the approval stamp. No sheet size stated. Processing: 10 business days to accept a received application; 2 business days administrative issue after approval.
Who signs the plans
City of Boulder Planning & Development Services issues the electrical (PV) permit and does its own electrical inspection (not DORA). Contractor is designer of record; the portal has a 'Structural Letter' upload type and the residential guide says added PV loads must be in the structural engineer's calculations for new work.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Boulder's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.