Solar permit plan sets for Boulder County, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Boulder County at a glance
| County | Boulder County |
|---|---|
| Utility | Xcel Energy (most of the county); Longmont Power & Communications, United Power and Poudre Valley REA serve some unincorporated areas |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Boulder County Community Planning & Permitting (unincorporated county only). Online building permit application with construction drawings as PDF. Electrical review by county electrical inspectors. No sheet size or review time stated. After install, a signed Letter of Verification on company letterhead (array equipment and grounding installed per NEC 690.41-690.47 and manufacturer instructions) goes to buildinginspectors@bouldercounty.gov.
Who signs the plans
Boulder County CPP issues one building permit covering structural and electrical; electrical review and inspection by county electrical inspectors (not DORA). Every roof-mounted system needs an engineer's evaluation of the roof's dead-load capacity referencing the site's wind and snow loads (and covering panels that project above the ridge); every pole or ground mount needs a footing design by an engineer.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Boulder County's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.