New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Colorado · Brighton

Solar permit plan sets for Brighton, Colorado

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Brighton at a glance

CountyAdams County
UtilityUnited Power and Xcel Energy (both serve parts of Brighton; check the service address)
Permit pathFull plan review
Structural engineer's stampUsually required
Electrical engineer's stampNot usually required

How submission works

City of Brighton Community Development through the OpenGov portal (brightonco.portal.opengov.com, category Solar/EV Installation); contractor needs a city licence first. Portal text: 'a stamped [letter from an engineer] in regard to truss load capacity and a standard PV plan set is required.' Codes page lists solar permits under 'rapid review'. Rough inspection by uploaded photos (house and address, flashing, hold-downs, rails, junction boxes, bonding, any structural upgrades; no links or zip files). No sheet size stated.

Who signs the plans

City of Brighton issues building and electrical permits (city adopted NEC 2023 effective 2023-07-01). Stamped structural letter from an engineer on every job;

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Brighton's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.