New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Colorado · Denver

Solar permit plan sets for Denver, Colorado

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Denver at a glance

CountyDenver County
UtilityXcel Energy
Permit pathSolarAPP+ instant permit for eligible systems; plan review otherwise
Structural engineer's stampOnly if the structural checklist fails
Electrical engineer's stampOnly if the structural checklist fails

How submission works

Denver Community Planning and Development, E-Permits (Accela, denvergov.org/epermits). SolarAPP+ path: approve at gosolarapp.org, then E-Permits > Quick Permits > Electrical > Single Family Res./Duplex > Solar PV, upload SolarAPP+ approval and inspection checklist plus spec sheets; permit same day. Non-SolarAPP path: Building Log > Single-Family/Duplex Residential > Solar Panels, state whether >= 10 kW; plans are reviewed (about 30 days per city statements). Zoning permit first for ground-mounted panels or generators; Landmark Preservation approval first for designated structures/districts. Reduced solar permit fees per Policy Admin 138.

Who signs the plans

Denver CPD issues and inspects the electrical permit itself (Denver runs its own program, not DORA). PV permits are electrical permits pulled by a licensed electrician (SolarAPP+) or electrical contractor. Non-SolarAPP jobs need structural calculations, or the residential structural integrity letter, sealed by a Colorado PE; the letter is not required when approved SolarAPP+ documents are submitted. Electrical plans need a Colorado PE seal only for systems >= 10 kW, or with a generator, or solar shingles (all IRC townhomes 3+ units and commercial always). Inspection 'qualified person' may be a NABCEP-certified installer for services <= 400 A.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Denver's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.