Solar permit plan sets for Douglas County, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Douglas County at a glance
| County | Douglas County |
|---|---|
| Utility | CORE Electric Cooperative (most of the unincorporated county); Xcel Energy (northern suburbs such as Highlands Ranch) |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Douglas County Building Division (100 Third St., Castle Rock; 303-660-7497): submit in person or by email, all documents in PDF, one permit application per email. Signed CORE application form required in the packet when CORE is the utility (since 2022-01-10); CORE will not accept a production-meter release dated before CORE approved the PV plans. A building permit is required when the engineer's letter calls for truss reinforcement; otherwise a building permit may still be filed and only electrical inspections are made. No sheet size or review time stated.
Who signs the plans
Douglas County Building Division issues building and electrical permits and inspects (local electrical authority). A structural engineer's signature and seal is required for PV modules on every job; an electrical engineer's seal is required for PV on anything other than a dwelling unit (so not for homes).
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Douglas County's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.