Solar permit plan sets for Englewood, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Englewood at a glance
| County | Arapahoe County |
|---|---|
| Utility | Xcel Energy |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Usually required |
How submission works
Englewood Building Division (1000 Englewood Pkwy) through the city's online permit system; certain documents must be combined into single files as the upload screen directs; non-compliant files rejected. Resubmittals need a written response, revision clouds and updated title block. Re-roof panel removal needs a separate electrical permit. City reports about 24-hour inspection scheduling and at least two inspections per residential solar permit. No sheet size or review time stated.
Who signs the plans
City of Englewood Building Division issues the solar permit (building and electrical). Structural observation letter sealed by a Colorado-licensed structural engineer and all electrical drawings sealed by a Colorado-licensed electrical engineer on every job; seals from other states or other disciplines are refused. Structural retrofits need a Class C (or better) general contractor added as a subcontractor.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Englewood's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.