Solar permit plan sets for Fort Collins, Colorado

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Fort Collins at a glance

CountyLarimer County
UtilityFort Collins Utilities (municipal Light & Power)
Permit pathFull plan review
Structural engineer's stampUsually required
Electrical engineer's stampNot usually required

How submission works

Building permit through Fort Collins Building Services (Accela Citizen Access, accela-aca.fcgov.com); all documents as PDFs named 'Apps - Address - v1' and 'Plans - Address - v1'; plan check fee paid at submittal. A separate Utilities interconnection and rebate application goes in PowerClerk (fortcollinsutilitiesder.powerclerk.com) and must be approved before the permit is issued and before installation; any revision during construction must be resubmitted identically to both Utilities and Building Services. No sheet size or review time stated.

Who signs the plans

Building Services issues the building permit and inspects for electrical code compliance; Fort Collins Utilities separately tests the system before the Permit to Operate. Installer must be a City-licensed Solar Energy PV contractor (with a Master Electrician on staff or subcontracted) or a Master Electrician holding the City solar licence. A stamped structural evaluation by an engineer is listed on every job; the one-line may be by a licensed engineer or electrician. Poudre Fire Authority issues a separate permit for ESS over 20 kWh per unit or over the 40/80 kWh aggregate limits.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Fort Collins's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.