New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Colorado · Grand Junction

Solar permit plan sets for Grand Junction, Colorado

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Grand Junction at a glance

CountyMesa County
UtilityXcel Energy (most of city); Grand Valley Power on some edges
Permit pathFull plan review
Structural engineer's stampUsually required
Electrical engineer's stampNot usually required

How submission works

Building permit from the Mesa County Building Department through the county 'Customer Portal for Community Development'. Grand Junction's own permits page sends building permits to the county (970-244-1631) and keeps planning clearances at City Community Development (970-244-1430). Roof-mount residential PV in Grand Junction needs no planning clearance; residential ground mounts need a residential planning clearance before issuance; commercial systems need city planning and fire clearance.

Who signs the plans

Mesa County Building Department (Community Development, 200 S. Spruce St, Grand Junction; 970-244-1631) issues building permits for unincorporated Mesa County, the City of Grand Junction and the towns of De Beque, Collbran and Palisade: one shared department. Electrical: the county PV guide reviews the three-line diagram and county inspections include contemporaneous electrical licence checks, so electrical appears to be reviewed and inspected by the county rather than DORA. A structural certification report is required on every PV permit;

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Grand Junction's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.