Solar permit plan sets for Greeley, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Greeley at a glance
| County | Weld County |
|---|---|
| Utility | Xcel Energy |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Greeley Building Inspection via eTRAKiT (trakit.greeleygov.com/etrakit). Review times (working days): residential addition or remodel 10, new construction 20; no solar-specific time. Plan review fee 65 % of the permit fee, waived for valuations under $25,000; 2.8 % card fee. Contractor licence required for permits from 2027-01-01. No sheet size stated.
Who signs the plans
City of Greeley Building Inspection issues building and electrical permits (an electrical permit is required for any electrical installation) and inspects; 970-350-9830, Building.Inspection@greeleygov.com. City contractor licensing starts 2027-01-01. Structural letter requirement not published by the City; borrowed from Weld County, which requires one on every roof mount.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Greeley's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.