New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Colorado · Jefferson County

Solar permit plan sets for Jefferson County, Colorado

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Jefferson County at a glance

CountyJefferson County
UtilityXcel Energy (most of the county); IREA in parts of the southwest foothills
Permit pathFull plan review
Structural engineer's stampOnly if the structural checklist fails
Electrical engineer's stampNot usually required

How submission works

Jefferson County Division of Building Safety (100 Jefferson County Pkwy, Golden; 303-271-8260) electrical permit filed online at citizenportal.jeffco.us. Since 2021-02-15 the county does NOT plan-review residential PV before issuing the electrical permit; the complete plan must be on site for the final inspection. Ground mount or tilt-up arrays may also need a miscellaneous Planning & Zoning permit; PV shingles also need a roofing permit by a licensed roofer or homeowner. General plan submittals are PDF; no PV sheet size stated.

Who signs the plans

Jefferson County Building Safety issues the electrical permit and inspects (unincorporated county only; cities such as Lakewood, Arvada, Golden, Wheat Ridge run their own departments). Licensed electrician required for the rapid shutdown test at final. A Colorado engineer's stamped details are required only when the roof-mount dead load exceeds the roof system design.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Jefferson County's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.