Solar permit plan sets for Lakewood, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Lakewood at a glance
| County | Jefferson County |
|---|---|
| Utility | Xcel Energy |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Only if the structural checklist fails |
How submission works
City of Lakewood Public Works - Permits (Civic Center North, 470 S Allison Pkwy, 303-987-7500) via eTRAKiT, permit type 'Alternative Energy'. One building permit; separately registered electrical contractor added to the permit. Every contractor needs a City of Lakewood contractor registration.
Who signs the plans
City of Lakewood Public Works issues the building permit and inspects electrical work itself (not a DORA state-inspected area); contractor must hold Lakewood contractor registration. A Colorado PE must perform the structural analysis of the existing roof on every job. Electrical design must bear a Colorado PE seal where the electrical service panel is over 200 A.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Lakewood's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.