Solar permit plan sets for Littleton, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Littleton at a glance
| County | Arapahoe County |
|---|---|
| Utility | Xcel Energy |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Usually required |
How submission works
Littleton Building and Code Compliance Division; all documents submitted electronically (eTRAKiT, permit9.littletonco.gov/etrakit). Codes must be noted on plans; 'Preliminary' or 'Not for Construction' sets rejected; address on every document. Contractors must be licensed in Littleton for PV and electrical work. Only 25% of panels may go on before rough frame and rough electrical inspections. No sheet size or review time stated.
Who signs the plans
City of Littleton Building and Code Compliance Division issues building and electrical permits. Every sheet with structural information must be digitally stamped by a Colorado-registered structural engineer, plus a stamped structural letter; every sheet with electrical information must be digitally stamped by a Colorado-registered electrical engineer.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Littleton's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.