Solar permit plan sets for Longmont, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Longmont at a glance
| County | Boulder County |
|---|---|
| Utility | Longmont Power & Communications (municipal) |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Longmont Building Services via Accela Citizen Access (aca.longmontcolorado.gov). Permit must be pulled by a City of Longmont and Colorado licensed electrical contractor. Complete applications meeting the 'Solar ABC's' expedited process are turned around in 5 business days; jobs with a service upgrade do not qualify. Building Services typically approves within 3 days after LPC approves the interconnection. No sheet size stated. Fees capped under HB 11-1199 (city page).
Who signs the plans
City of Longmont Building Services issues the building/electrical permit and inspects (not DORA); LPC approves interconnection and issues Permission to Operate. Every job needs a site-specific structural engineer letter stating the adopted wind and snow loads and that the structure carries the added PV load.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Longmont's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.