Solar permit plan sets for Loveland, Colorado

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Loveland at a glance

CountyLarimer County
UtilityLoveland Water and Power (municipal)
Permit pathFull plan review
Structural engineer's stampUsually required
Electrical engineer's stampNot usually required

How submission works

Step 1: interconnection request application to Loveland Water and Power's Distributed Energy Resources Division (der@cityofloveland.org); a Notice to Proceed is issued after approval. Step 2: email the building permit package to Eplan-Res@cityofloveland.org: Notice to Proceed letter, Solar Residential permit application (Building Division Residential Forms page), plan review fee deposit and construction plans. Contractor needs a current City of Loveland Class C or Class C Limited licence and an Electrical Fast Track permit application.

Who signs the plans

City of Loveland Building Division issues the building and electrical permit (Electrical Fast Track) and inspects through final electrical; Loveland Water and Power DER Division approves interconnection first. Contractor needs a City Class C or Class C Limited licence. Whether a structural letter from an engineer is required on every job could not be confirmed from the City; neighbours Fort Collins and Larimer County both require one, and a third-party guide (permitmint.com) says a PE stamp is needed at 10 kW and above.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Loveland's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.