Solar permit plan sets for Parker, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Parker at a glance
| County | Douglas County |
|---|---|
| Utility | CORE Electric Cooperative (formerly IREA); Xcel Energy in parts |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Town of Parker Building Division via eTrakit, PDF only. Target review for simple solar permits 10-14 business days; notified in eTrakit when review is done and fees payable online. Permit and plan review fee $500 residential ('per State requirements') plus taxes. Reviewed by a Town electrical inspector. All inspections (rough electrical, rough frame, final electrical, final building, electrical service) scheduled the same day; contractor on site with Town-stamped plans and the signed rooftop installation affidavit; attic access needed; rapid shutdown test at inspection. No sheet size stated.
Who signs the plans
Town of Parker Building Division issues building and electrical permits; PV plans reviewed by a Town electrical inspector. Every roof mount needs an engineer's signed, sealed letter on roof capacity plus the engineer's stamp on all structural sheets.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Parker's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.