Solar permit plan sets for Thornton, Colorado
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Thornton at a glance
| County | Adams County |
|---|---|
| Utility | Xcel Energy (United Power serves some northern parcels; confirm) |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Thornton Building Inspection Division via CityView portal (cityviewportal.thorntonco.gov); one plan review per address. One plan set including spec sheets; all pages one uniform size, any size acceptable, with a plan-review stamp area in the title block in the same place on every sheet. No panel photos and no separate line-diagram file needed. Signed contract showing total labour and material cost matching the permit valuation; main panel upgrades on a separate MPU permit. Revisions as a full clouded set. Finals done virtually 8-10 am.
Who signs the plans
City of Thornton Building Inspection Division issues and inspects building and electrical (not DORA). 'All commercial systems, and the structural portion of residential plans' must bear the stamp and signature of a Colorado PE; roof installs need a structural analysis by a Colorado-licensed engineer for added dead load and wind uplift.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Thornton's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.