Solar permit plan sets for Idaho Falls, Idaho
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Idaho Falls at a glance
| County | Bonneville County |
|---|---|
| Utility | Idaho Falls Power (municipal) |
| Permit path | Full plan review |
| Structural engineer's stamp | We confirm this with the department before you pay |
| Electrical engineer's stamp | We confirm this with the department before you pay |
How submission works
City of Idaho Falls Building Division. The general 'Building Permit Checklists' PDF calls for electrical plans by an engineer on any work over $5,000 valuation (paraphrased) (scope, residential or commercial, unclear). Interconnection: Idaho Falls Power Net Metering and Small Generation Interconnection Agreement Application (notarized, one-line, spec sheets).
Who signs the plans
Building and electrical permits both issued by the City of Idaho Falls (city electrical program with its own inspectors). PE stamp trigger for PV not published; possible electrical-engineer requirement above $5,000 valuation (confirm).
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Idaho Falls's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.