Solar permit plan sets for Meridian, Idaho
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Meridian at a glance
| County | Ada County |
|---|---|
| Utility | Idaho Power |
| Permit path | Full plan review |
| Structural engineer's stamp | We confirm this with the department before you pay |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Meridian Building Services via Citizen Access portal. PDF only, landscape, individual sheets, each drawn to scale with scale stated, blank upper-left corner for city stamp, sheet-named files (e.g. CS, SP1, S4.0, E2.0); calcs as searchable PDF. No sheet size stated. Electrical plan review required for all PV.
Who signs the plans
Building and electrical permits both issued by the City of Meridian (city electrical program, City Code Title 10 Ch. 3). Structural calcs and geotech reports, when submitted, must carry an Idaho licensed engineer's stamp; the checklist publishes no trigger for when calcs are needed.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Meridian's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.