New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Idaho · Post Falls

Solar permit plan sets for Post Falls, Idaho

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Post Falls at a glance

CountyKootenai County
UtilityAvista (some areas Kootenai Electric Cooperative)
Permit pathFull plan review
Structural engineer's stampWe confirm this with the department before you pay
Electrical engineer's stampNot usually required

How submission works

City of Post Falls Building Division. No PV checklist; general Residential Building Plan Submittal Requirements apply. Electrical application may be filed after the building application; electrical plan check $65/hr, 2 hr min.

Who signs the plans

Building and electrical permits both issued by the City of Post Falls. PE stamp trigger not published.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Post Falls's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.