Solar permit plan sets for Post Falls, Idaho
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Post Falls at a glance
| County | Kootenai County |
|---|---|
| Utility | Avista (some areas Kootenai Electric Cooperative) |
| Permit path | Full plan review |
| Structural engineer's stamp | We confirm this with the department before you pay |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Post Falls Building Division. No PV checklist; general Residential Building Plan Submittal Requirements apply. Electrical application may be filed after the building application; electrical plan check $65/hr, 2 hr min.
Who signs the plans
Building and electrical permits both issued by the City of Post Falls. PE stamp trigger not published.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Post Falls's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.