Solar permit plan sets for Twin Falls, Idaho
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Twin Falls at a glance
| County | Twin Falls County |
|---|---|
| Utility | Idaho Power |
| Permit path | Full plan review |
| Structural engineer's stamp | Only if the structural checklist fails |
| Electrical engineer's stamp | Not usually required |
How submission works
City of Twin Falls Building Safety via Cityworks portal. Expedited path (inverter output <= 13.44 kW, mounting with an engineer's letter, < 5 psf and < 40 lb/attachment, listed components, pitch > 2/12, no ballast): SolarABCs Expedited Permit form steps 1-2 plus site plan with dimensions to ridge and edges. No in-office plan review; short review at inspection.
Who signs the plans
Building and electrical permits both issued by the City of Twin Falls (combined M/E/P trade permits). Engineering required only if roof load exceeds 5 psf.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Twin Falls's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.