New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Idaho · Twin Falls

Solar permit plan sets for Twin Falls, Idaho

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Twin Falls at a glance

CountyTwin Falls County
UtilityIdaho Power
Permit pathFull plan review
Structural engineer's stampOnly if the structural checklist fails
Electrical engineer's stampNot usually required

How submission works

City of Twin Falls Building Safety via Cityworks portal. Expedited path (inverter output <= 13.44 kW, mounting with an engineer's letter, < 5 psf and < 40 lb/attachment, listed components, pitch > 2/12, no ballast): SolarABCs Expedited Permit form steps 1-2 plus site plan with dimensions to ridge and edges. No in-office plan review; short review at inspection.

Who signs the plans

Building and electrical permits both issued by the City of Twin Falls (combined M/E/P trade permits). Engineering required only if roof load exceeds 5 psf.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Twin Falls's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.