Solar permit plan sets for Lehi, Utah
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Lehi at a glance
| County | Utah County |
|---|---|
| Utility | Lehi City Power (municipal) |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Lehi City Power approves first through its solar portal (lehisolar.portal.iworq.net); then plans go to Building and Inspections via iWorQ (lehibuilding.portal.iworq.net). One plan set must carry the Lehi Power Department approval stamp. No sheet size stated.
Who signs the plans
Building and electrical issued by the city. 'Engineer letter for roof structure' on every job.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Lehi's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.