Solar permit plan sets for Logan, Utah
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Logan at a glance
| County | Cache County |
|---|---|
| Utility | Logan City Light & Power (municipal) |
| Permit path | SolarAPP+ instant permit for eligible systems; plan review otherwise |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
Everything goes through Light & Power's Logan Solar Portal (solar.logancitypower.app): L&P approves interconnection first (~5 business days), then Building Safety issues the permit (1-2 business days). SolarAPP+ approval ID is entered in the portal and replaces the full plan set for eligible systems. Installers and designers must be NABCEP certified, attend a one-time $50 orientation and bring their DOPL licence; the homeowner watches an orientation video and signs. No sheet size stated.
Who signs the plans
Building and electrical issued by Logan Building Safety after Light & Power approval. Standard review needs 'a structural letter from a Utah-licensed engineer';
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Logan's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.