New: residential solar plan sets from $79, next business day →
Draft HorseCheck my job
Utah · Riverton

Solar permit plan sets for Riverton, Utah

Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.

Check if my job fitsStart a $79 set onlineSample set (PDF)

Riverton at a glance

CountySalt Lake County
UtilityRocky Mountain Power
Permit pathFull plan review
Structural engineer's stampUsually required
Electrical engineer's stampNot usually required

How submission works

Riverton City Building by email to the Chief Building Official; no portal or sheet size stated. Unified Fire Authority / Riverton Fire Marshal reviews every roof layout.

Who signs the plans

Building and electrical issued by the city. Every job needs a 'letter from Structural Engineer with Utah stamp' saying the roof carries the solar load; ground arrays need a footing design. No electrical stamp.

What you get

Included

  • Site plan, roof plan and array layout
  • Single-line diagram
  • Labels and placards
  • Equipment data sheets
  • Unlimited revisions, never charged

Not included

  • An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
  • Permit fees

From Riverton's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.