Solar permit plan sets for Salt Lake City, Utah
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
Salt Lake City at a glance
| County | Salt Lake County |
|---|---|
| Utility | Rocky Mountain Power |
| Permit path | Full plan review |
| Structural engineer's stamp | Only if the structural checklist fails |
| Electrical engineer's stamp | Not usually required |
How submission works
SLC Building Services via Accela Citizen Access (aca-prod.accela.com/SLCREF). One permit covers structural, electrical, zoning and fire review. Site plan 'need not be exactly to scale'. Simplified electrical review limited to ≤4 strings per inverter, ≤15 kW, inverter output ≤13,440 W, load-side connection. No sheet size stated.
Who signs the plans
Building and electrical review both by SLC Building Services under one permit; contractor's DOPL licence number on the application. A design professional's confirmation is needed only for over-spanned rafters or trusses, arrays over 5 psf, over 45 lb per attachment, or roofs short of IRC live load; the applicant may instead submit a strengthening framing plan. Ground mounts over 6 ft above grade 'may require' calculations.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From Salt Lake City's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.