Solar permit plan sets for South Jordan, Utah
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
South Jordan at a glance
| County | Salt Lake County |
|---|---|
| Utility | Rocky Mountain Power |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
South Jordan Building Department via CityView portal. No sheet size stated.
Who signs the plans
Building and electrical issued by the city. Every roof job needs 'a letter from a structural engineer' ('a Utah Licensed Structural Engineer' on existing homes) confirming the roof carries the array 'and any additional snow drift loading', with the upgrade design if it does not. No electrical stamp.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From South Jordan's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.