Solar permit plan sets for St. George, Utah
Residential rooftop sets from $79, up to 15 kW with standard equipment. Send a complete package by 3 pm Mountain on a business day and we deliver the next business day. Unlimited revisions, never charged.
St. George at a glance
| County | Washington County |
|---|---|
| Utility | St. George Energy Services Department (municipal) |
| Permit path | Full plan review |
| Structural engineer's stamp | Usually required |
| Electrical engineer's stamp | Not usually required |
How submission works
St. George Building Department via CityInspect, but the utility application is the permit application: SGESD engineer approves the net-metering application first, then Building reviews, then the permit issues. Installer needs a Utah S200/S201/S202 licence, a St. George business licence and the SGESD Pre-Qualified Solar PV Contractor class. No sheet size stated.
Who signs the plans
Building and electrical issued by the city after SGESD approval. Structural engineer's letter on every application. Electrical engineer's stamp only for three-phase or commercial systems ('designed and stamped by an electrical engineer licensed in the State of Utah'); residential single-phase needs none.
What you get
Included
- Site plan, roof plan and array layout
- Single-line diagram
- Labels and placards
- Equipment data sheets
- Unlimited revisions, never charged
Not included
- An engineer's stamp. If your building department needs one, we'll introduce an engineer; their fee is separate.
- Permit fees
From St. George's published materials as we read them in November 2026. Requirements change, so we confirm yours before you pay. This page isn't legal or engineering advice. Draft Horse provides drafting services; permit approval is the building department's decision.